HGX B200 SXM6: 8-GPU Server System

First-generation Blackwell. 180 GB HBM3e per GPU, NVLink 5, NDR800. New-build only, no secondary market yet.

New build, factory order$565,000stable MoM
Lead time14–20 weeks

What HGX B200 systems trade at

SeriesMinMedianMaxNMoM
New build, factory order$540,000$565,000$590,0007stable

Full server system pricing: chassis, NDR networking, host CPUs, and memory included. Indicative market ranges, updated Jul 18, 2026. Verified series publish once they clear our N-quote threshold: median of verified quotes, supplier-blind.

HGX B200: full system specs

GPUs8× NVIDIA B200 SXM6
GPU memory180 GB HBM3e per GPU · 1.4 TB total
Memory bandwidth8.0 TB/s per GPU · 64 TB/s total
GPU interconnectNVLink 5 · 1.8 TB/s bisection · NVSwitch
FP4 (system)~144 PFLOPS dense
FP8 (system)~72 PFLOPS dense
GPU TDP1,000 W per GPU
System power draw~14–16 kW · plan 18–20 kW with PUE
Host platform2× Xeon SP or EPYC · 2 TB DDR5 · PCIe Gen 5
Common chassisSupermicro SYS-821GE-TNHR · Dell XE9780
Network fabric8× ConnectX-8 800G NDR800 InfiniBand
Form factor10U, increased power and cooling vs H100

Should you buy a HGX B200?

Buy HGX B200 if

Building a frontier training cluster

B200's 4× FLOPS improvement over H100 and 2.25× memory bandwidth justify the price for large-scale training. The roadmap is Blackwell.

Buy HGX B200 if

You can absorb 14–20 week lead time

New Blackwell is the right call if you're planning a cluster that runs for 3+ years and timing isn't the constraint.

Consider alternatives if

Consider H100 for immediate capacity

H100 deploys in 1–3 weeks at $250K/system. If you need GPUs now, the secondary market wins on speed.

HGX H100 pricing →

Used vs refurb: what the premium buys

FactorUsed, testedRefurb, warranted
WarrantyNone / seller DOA window90-day seller warranty + DOA
Burn-in reportAvailable (ask for it)Included and certified
Price premium+8–12% over used median
Right forBuyers who can evaluate burn-in logsTeams who want turnkey assurance

What to verify before buying

At this price point, skipping due diligence is expensive. Every item below should have a documented answer before you wire funds.

  • Verify OEM factory order is confirmed, not just quoted
  • Lock allocation terms in writing: delivery window, cancellation terms
  • Power infrastructure: B200 needs ~14–16 kW per node vs ~10 kW for H100
  • Confirm NDR800 switch compatibility if expanding an existing NDR cluster

Export control notice

B200 carries advanced export controls, stricter than H100/H200. Verify end-user and destination against current BIS entity lists before placing an order.

Looking to buy HGX B200 systems?

Submit your requirements: quantity, condition, timeline, and budget. We benchmark against the Index and match you with verified supply.

Have HGX B200 inventory to sell?

List your lot: describe what you have, condition, and quantity. We benchmark against the Index and surface it to qualified buyers.